
Solar & EV charging installers
Solar and EV takeoffs, fully charged.
Save your energy. Give the counting to a pig.
Upload the drawings. Sweinstein counts chargers, inverters and equipment, reads their specs, and checks the breakers on the panel schedules that feed them.
Counts
1 to review
What it counts
- EV chargers by type
- Inverters, disconnects and equipment
- Breakers feeding chargers and inverters
What it checks
- Charger specs against panel breakers
- Equipment schedule against plan counts
- Notes and specs across sheets
Ask it
- "Any specs on the EV charger?"
- "What breaker feeds the inverter?"
- "How many level 2 chargers?"
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |


Sweinstein runs on sunshine and curiosity. Mostly curiosity.
Measure on top of the count
After the count, Sweinstein traces conduit and feeder runs to panels, inverters and chargers. Lengths are worked out exactly from each sheet's confirmed scale. The AI traces; the math is done in code.
Ask about your local code
Ask about CEC or NEC rules for solar and EV charging in your province or state. Answers quote the code books your company uploads and follow the project's province or state. They are a reference, not legal advice.

“Your counts are done. Go fire up the barbecue.”
FAQ
Solar & EV Charging questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free with 2 takeoffs on us, then 1 every month. No card needed.
Start free
