
Plumbing contractors
Plumbing takeoffs, flushed out fast.
You're a plumber. Not a full-time fixture counter.
Upload the P sheets. Sweinstein counts fixtures and drains, pulls every fixture and equipment schedule, and answers your questions about the plans.
Counts
1 to review
What it counts
- Plumbing fixtures by type
- Floor drains and cleanouts
- Water heaters and equipment
What it checks
- Fixture schedule against plan counts
- Equipment needing electrical hookups
- Notes and specs across sheets
Ask it
- "How many WC-1 on the main floor?"
- "What size is the water heater?"
- "Any notes about backflow?"
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |


No more drowning in fixture counts. Sweinstein loves a good mud bath, not a backlog.
Measure on top of the count
After the count, Sweinstein traces pipe runs and totals the lengths per floor. Lengths are worked out exactly from each sheet's confirmed scale. The AI traces; the math is done in code.
Ask about your local code
Ask about the plumbing code for your province or state. Answers quote the code books your company uploads and follow the project's province or state. They are a reference, not legal advice.

“Your counts are done. Go fire up the barbecue.”
FAQ
Plumbing questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free with 2 takeoffs on us, then 1 every month. No card needed.
Start free
