
Engineers & architects
Catch the mismatch before the contractor does.
Let a pig root out the awkward questions first.
Upload your set before you issue. Sweinstein cross-checks schedules, legends and plans across disciplines and shows you where the drawings disagree.
Counts
1 to review
What it counts
- Symbols against each sheet's legend
- Schedule entries by discipline
What it checks
- Breaker sizes against equipment schedules
- Fixture types on plans against schedules
- Notes and specs that conflict between sheets
Ask it
- "Do the panel breakers match the mechanical schedule?"
- "Is every luminaire type on the plans scheduled?"
- "Which sheets mention the generator?"
| Circuit | Breaker | Poles | Load |
|---|---|---|---|
| LP-1 | 20A | 1P | Lighting — Dining |
| LP-3 | 20A | 1P | Receptacles — Kitchen |
| LP-5 | 30A | 2P | Walk-in cooler |
| LP-7 | 40A | 2P | RTU-1 |


Fewer RFIs, more pig puns. A fair trade.
Measure on top of the count
Check run lengths on your own drawings before you issue. Lengths are worked out exactly from each sheet's confirmed scale. The AI traces; the math is done in code.
Ask about your local code
Look up code rules from your own books while you review the set. Answers quote the code books your company uploads and follow the project's province or state. They are a reference, not legal advice.

“I'll take the takeoff. You take the mud bath.”
FAQ
Engineers & Architects questions

Stop counting. Start bidding.
Upload your plans. Sweinstein has you covered. Start free with 2 takeoffs on us, then 1 every month. No card needed.
Start free
